Biblioteca Octavio Paz (París)

Cervantes_Paris (1)

Descripcion del proyecto

Lugar de ejecución: Instituto Cervantes 11 / Avenue Marceu (París)
Estado: Finalizado

El edificio consta de una planta bajo rasante, 3 planta sobre rasante y un bajo cubierta. La rehabilitación tiene parte de refuerzo estructural mediante micropilotaje para albergar un ascensor y una escalera para hacerlo accesible. Se sustituyen revestimientos horizontales y verticales, se crean nuevas distribuciones, se sustituyen carpinterías y se recuperan otras. Se sustituyen y/o adaptan todas las instalaciones para adaptarlas al nuevo funcionamiento del edificio y a la normativa vigente.

Embassy of Sweden in Madrid

Oficina comercial E.suecia (3)

Project Description

Place of execution: Embassy of Sweden (Madrid)
Status: Completed

Adaptation of residential area to office area by means of room redistribution, modification of facilities, replacement and restoration of cladding and carpentry, new glazed enclosures and adaptation to regulations.

Cafeteria of the Humanities building of the UNED (Madrid)

Cafeteria UNED (4)

Project Description

Place of execution: UNED (Madrid)
Status: Finished

Refurbishment of the cafeteria in the Humanities building by renovating the vertical and horizontal cladding, interior and exterior carpentry, as well as updating the installations to adapt the layout to the cafeteria’s operating needs and to current regulations. Approx. 623 m2 semi-basement 2 and 50 m2 in semi-basement 1.

Office renovation (Madrid)

Sagasta 31 (1)

Project Description

Place of execution: Calle Sagasta 31 (Madrid)
Status: Finished

Office refurbishment through modification of distributions, replacement of horizontal and vertical coverings and adaptation of installations.

Rehabilitation of 3 floors for 9 luxury homes (Madrid)

20190327_112052

Project Description

Place of execution: Calle Cedaceros 3 (Madrid)
Status: Finished

Rehabilitation in historic building of three intermediate floors; second, third and fourth and common areas.

Structural reinforcement and internal redistribution to house 3 dwellings on each of the floors. High quality carpentry, finishes and installations.

Conservation of facade and roof (Madrid)

Fachada Velazquez 44

Project Description

Place of execution: Calle Velázquez 44 (Madrid)
Status: Finished

Facade and Roof Conservation in Velázquez

Renovation and rehabilitation of the roof and façade of the building.

Offices building for UNED (Spanish Distance University), Madrid

uned 1

Project description

Client: Universidad Nacional de Educación a Distancia (U.N.E.D).
Execution location: Calle Juan del Rosal 14, Madrid.
Stage: Finished.

The total piece of land of the building has an extension of 11,500 m² built and the total investment of the works reached 10 million Euros.

The works performed have implied the renovation and full refurbishment of the building, adjusting its structure to the new requirements of the regulations in force. Furthermore, it was incorporated to the central roof a thermal production central for the air conditioning and heating of the four buildings of the UNED campus.

Full renovation of a university college (Madrid)

258869

Project description

Client: Fundación SEPI.
Execution location: Avda. de Gregorio del Amo, Nº2, Madrid.
Stage: Finished.

There were several full restructuring actions in order to adjust the space to the new needs of the building. There were demolitions works, structure reinforcement and upgrading of the facilities, so that they comply with the current regulations and in accordance with the strict energy efficiency.

The works were carried out in 5 STAGES from 2002 to 2007.

 

 

Partial Renovation in the college Nuestra señora de África (Madrid)

OLYMPUS DIGITAL CAMERA

Project description

Client: Colleges Foundation  MAEC-AECID.
Execution location: C/ Ramiro Maeztu 8, Madrid.
Stage: Finished.

There were renovation works and adaptation to the regulations in force on humid sites.

The action consisted in the execution of the new installations of sanitation, plumbing and electricity, as well as the demolition and reconstruction of inside layout.